Neighborhood watch
Colonial Heights
Official planning, permit, food, liquor-license, Public Works capital-project, and project-linked City Hall records for this Sacramento neighborhood.
- Stockton Boulevard STEP is in City planning or preliminary engineeringProposed
Sacramento Public Works lists Stockton Boulevard STEP in the “Preliminary Engineering” phase. On Stockton Boulevard, from Florin Road to Alhambra Blvd: Multi-modal and safety improvements, including bus lanes and/or other transit enhancements, bicycle lanes, and pedestrian upgrades. The project will also include an alternatives analysis phase for the bus rapid transit (BRT) and BRT-lite treatments along the longer RT’s Route 51 alignment between South Sacramento and the Sacramento Valley Station, which includes Stockton Blvd (between Florin Road and Broadway), Broadway (between Stockton Boulevard and 8th Street), and segments of 7th, 8th and 9th Streets. Schedule fields are plans and may change.
- Permit issued for 5210 22ND AVE - Attached Wood Patio Cover - (345 sqft). at 5210 22ND AVEPermit Issued
City records show a permit was issued on 2026-07-21 for Install a wood patio cover attached to the house in backyard (345 sqft). An issued permit does not establish that construction has started.